伟德国际(bv1946·VIP认证)官网-Macau App Station

Design Capability

  • Industrial design

  • Mechanical design

  • Software design

  • Hardware design

Equipment Development Capability

  • Auto-screw locking machine

  • UWB whole machine auto-test equipment

  • Auto-loading and unloading equlpment for bllster tray

  • Vision technology experimental equipment

  • Auto-functional testing equipmen

Self-development ability of automatic production line

  • Completed function

    · Completed the production import of 2 automatic lines 2.0
    · One line produces 3812 and one line 3511
    · The automation line is currently carrying out 3511 production verification combined with 2-in-1 shielding box equipment
    · Collected and counted the problem points of automatic line 2.0 as the optimization experience in the next stage


  • Next stage Task

    · Collect and statistics the problem points of automatic line 2.0 to avoid them in the next stage of equipment upgrade
    · Introduced several automation debugging engineers


Analytical Skills in laboratory testing

  • Radio frequency OTA laboratory

    Set up rf test lab and OTA antenna test lab, which integrates antenna/RF simulation, RF test and antenna test

  • Failure analysis laboratory

    Set up failure analysis laboratory for device level failure analysis

  • Audio lab

    Set up audio testing laboratory, audio simulation, audio testing as a whole, to serve customers with high audio quality requirements for professional audio system design

  • Image laboratory

    Set up image testing and analysis laboratory for camera products

Baidu
sogou